Q-VAC Automatic Priming Systems
VACUUM PRIMING SYSTEMS

+1 (847) 540-0054


 

-Q-VAC Home

-Product Description

-Principle of Operation

-Types of Priming Systems

-Standard Models

-Accessories

-FAQ

-About us

-Q-VAC Brochure
(PDF Download)

-REQUEST A QUOTE

 

 

 


Combined Fluid Products Homepage About Us Contact Us

CFP's Website for Q-VAC High Quality Vacuum Priming Systems.
Call (800) 521-2083 (USA only) or contact us for assistance.


Request A Quote

For expert assistance in system selection, please provide the following details about your priming application.  A Solutions Engineer will contact you after reviewing the submitted information.

Please complete the form and click "Submit" below.  This form can also be downloaded (51Kb) and faxed.

Name:

Email:

Title:

Company:

Street:

City:

State/Province:

ZIP/Postal Code:

Country:

Telephone:
  Ext: 


1. What is the total volume that needs to be primed?
(Suction inlet piping + displacement of pump(s))

2. What vertical lift is needed from the lowest water level?

3. How quickly does the system need to be primed?
Minutes

4. What is the altitude at the site?

5. Will the system be installed indoors?
Yes.  No.  Not Sure.

6. What is the ambient temperature?

7. What is the Fluid type?
Raw Water.  Drinking Water.  Waste Water.
Sea Water.  Other.

8. What type of system is required?
Simplex.  Duplex.  Not Sure.

9. Do you need automatic (standard) or manual controls?
Automatic.  Manual.  Not Sure.

10. What vacuum technology is preferred?
Factory's Choice.  Rotary Vane.
Liquid Ring.  WOB-L Piston.

Why is this technology preferred?

11. How many pumps will be connected to the priming system?

12. What operating voltage is needed?
Volts.       

13. How many priming systems are needed?

14. Are there any special requirements?

15. Will your company be purchasing the priming system for this project or specifying it for others?
Purchasing.  Specifying.

16. Will this purchase be for resale?
Yes.  No.  Not Applicable.

17. What is the project name/reference?

18. When will the priming system for this project be ordered?

19. When will the priming system need to be on-site for installation?

 

Copyright 2017 -- Combined Fluid Products Company